Concept render of the Platform 30 unit at dusk: a navy barge with a lit data hall and a power plant with five exhaust stacks, moored at an industrial quay.

Floating AI data centres / 30 MW

AI capacity, delivered from the water.

Platform 30 develops standard 30 MW AI data centres that float in with their own power plant. We bring capacity to coastal hubs where the grid and land cannot deliver in time.

Talk to us
30 MW
IT capacity per unit
~50 MW
on-board power, N+1
~18 months
from financing to operation

Now developing the reference design and first sites in the US and Europe.

Concept render

01 The need

AI demand is outrunning the grid.

2×

Global data-centre electricity use doubles by 2030.

IEA ↗

30–55GW

Projected US generation-capacity gap by 2030.

McKinsey ↗

6.3%

Record-low vacancy across Europe's core data-centre hubs.

CBRE ↗

New data centres wait years for a grid connection. AI companies need capacity now.

02 How it works

Power arrives with the data centre.

  1. 01

    Secure a berth.

    An industrial port berth with fibre, close to the customer. Gas comes by pipeline or as LNG stored on board.

  2. 02

    Build in a yard.

    A shipyard builds the standard unit while the berth is prepared, in parallel.

  3. 03

    Tow, connect, run.

    The unit is towed in and connected. The customer installs its GPUs and goes live.

Concept render of the unit under construction in a dry dock: a crane lowers a white data-hall module onto the navy barge.
Concept render

03

How we deliver

  • Platform 30

    We develop the architecture and originate each project, from site and customer to financial close.

  • Qualified shipyards

    Build each unit to our standard design.

  • Project companies

    Own and finance each unit. A specialist data-centre operator runs it to the customer's SLA.

04 The unit

One standard unit. Built to scale.

Concept render of the unit at dusk. Cutaway line drawing of the same view: gas engines under the stacks, the electrical room, two levels of server racks in the data halls, and the busbar linking power to the halls.

Concept render

General arrangement
Power plant Electrical IT halls Support
Concept geometry, not to scale for constructionPower, fuel, fibre
  • Capacity 30 MW IT per unit; sites scale to 120+ MW
  • Power ~50 MW of on-board gas engines, N+1
  • Fuel Pipeline gas or on-board LNG
  • Cooling Liquid cooling for AI racks up to ~120 kW
  • Resilience Tier III-style design, Design PUE ~1.15
  • Platform Purpose-built barge, moored at an industrial berth

05

Why Platform 30

01

Certainty of date.

No grid queue. Power, cooling and the data hall arrive together, at a berth already zoned for industry.

02

Why on water

No land to assemble or rezone: we use an existing industrial berth. The yard builds the unit while the berth is prepared, and a site grows by adding units.

03

One standard, adapted to each site.

One architecture for data centre, power, cooling and marine systems, adapted to each port and customer.

04

Any qualified yard.

Yard-neutral by design: we build with the best yard for each project, and every new unit builds on the last.

05

Bankable by design.

Each unit is a self-contained project, structured for infrastructure capital from day one.

Concept render of the unit in daylight, moored at an industrial quay with cranes and port buildings behind.
Concept render

06

Built for

  • AI clouds that need 20–50 MW by a fixed date.

  • Sovereign AI programmes.

  • Hyperscalers that need fast bridge capacity.

07 Team

A team that has delivered first-of-a-kind offshore and energy assets

Team combined experience

65+ years

in marine, offshore and energy infrastructure

George Shevardenidze

George Shevardenidze

Founder

  • Offshore & energy projects
  • Owner-side delivery & assurance
  • AI & data
  • 15 years in marine and offshore; 5 in enterprise AI and ML
  • ~$2bn of first-of-a-kind offshore and energy assets, on the owner side
  • Ex oil major (owner side), DNV GL, TÜV Rheinland
Dmitrij Piazenko

Dmitrij Piazenko

Technical Advisor, Marine & Offshore

  • Marine & offshore operations
  • Floating structures & mooring
  • Class & marine assurance
  • 25 years in marine and offshore
  • 10+ major offshore projects, including Kashagan; 200+ marine operations
  • Ex Germanischer Lloyd, Noble Denton
Christian Völcker

Christian Völcker

Technical Advisor, Energy & Infrastructure

  • Energy project development
  • Offshore wind
  • Engineering & construction
  • 25+ years in energy and offshore wind, from the first German offshore projects
  • Led engineering and offshore construction on large offshore wind programmes
  • Ex Northland Power, TÜV Rheinland, E.ON

Let's talk.

  • Need 20–50 MW by a fixed date? Tell us your location, capacity and start date.
  • Investors: request the company overview.
  • Ports and partners: explore a site partnership.
hello@platform30.energy